Aediles Projects
Ten real projects in the aediles sector, from a single street to a whole municipal works program. Involvement in a project means participating in the project and sharing in its actual net revenue — the Participant Pool is 10% of each project’s net revenue, distributed monthly among qualifying participants. It is not a yield on AEDI and no return is promised.
Each project has a participation gate: hold AEDI worth 1% of the project’s value (in CAD). The gate is a balance check only — nothing is spent, transferred, or locked, ever. Holds stack: your balance must cover the sum of the gates of every project you join. Involvement stays active only while your wallet is connected and the hold is met; if the balance drops or the wallet disconnects, involvement suspends and resumes automatically when the hold is restored.
Need AEDI? Buy AEDI on XMarkets · Mine AEDI on Omnichain
Sidewalk Trip-Hazard Grinding Service — Edmonton & Capital Region T1 Bootstrap
Heaved sidewalk lips are the most common trip hazard — and liability claim — in every Alberta municipality, and the fix is a machine that grinds the lip flush in minutes instead of a $2,000 slab replacement.
| Project value | $35,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Units purchased, insurance bound, first municipal contract signed |
| Participation gate | Hold ≈ — AEDI ($350 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-kilometre and per-address service contracts, billed per completed segment. Every completed segment is photographed and filed as an ERP record, so a municipality's hazard map and the project's revenue ledger are the same document.
What involvement gets you: the pool share; the project dashboard (segments completed by municipality, contracts active, revenue); priority participation when the service expands to a second crew.
Milestones: Units purchased, insurance bound, first municipal contract signed · 25 km ground, first liability-reduction report delivered to a client · 3 municipalities under contract · second crew project scoped in this ERP
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Street Furniture Refurbishment Workshop T1 Bootstrap
Benches, bus shelters, bike racks, and litter bins across Alberta's towns are weather-beaten long before they're worn out — and councils replace them at full price because nobody local refurbishes them.
| Project value | $45,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Shop leased and equipped, first municipal contract |
| Participation gate | Hold ≈ — AEDI ($450 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-asset refurbishment contracts with municipalities and transit-adjacent property managers, plus resale of refurbished surplus stock. Asset intake photos, work orders, and returns are ERP records per asset.
What involvement gets you: the pool share; workshop throughput and contract reporting through the dashboard; first offer on refurbished stock sales for holders' own properties and businesses.
Milestones: Shop leased and equipped, first municipal contract · 200 assets refurbished · powder-coat line at capacity, waitlist managed in the ERP · second-bay expansion scoped
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Municipal Asset Inspection Service — Roofs, Bridges, Towers T2 Startup
Small municipalities own roofs, water towers, pedestrian bridges, and arenas they are required to inspect but cannot staff for.
| Project value | $150,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Crew certified, first 5 municipal clients |
| Participation gate | Hold ≈ — AEDI ($1,500 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-asset inspection fees and annual inspection programs sold to municipalities, school divisions, and regional commissions. Anchor clients are towns under 10,000 people, where the alternative is an engineering firm at three times the price.
What involvement gets you: the pool share; inspection volume and client reporting through the dashboard; priority booking for inspections of holders' own commercial properties.
Milestones: Crew certified, first 5 municipal clients · 150 assets inspected, report library live in the ERP · annual programs renewed by 80% of clients · bridge-inspection partnership with a licensed engineering firm signed
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Community Hall Energy Retrofit Program T2 Startup
Alberta's community halls, curling rinks, and legion buildings are the social centre of small towns — and most bleed heat through 1970s envelopes while volunteer boards juggle the utility bills.
| Project value | $220,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Crew hired, first 3 halls under contract |
| Participation gate | Hold ≈ — AEDI ($2,200 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: retrofit contract fees paid by hall societies and municipalities, stacked with available provincial/federal efficiency program funding; a program administration fee on each completed retrofit. Savings reports are published per hall from meter data.
What involvement gets you: the pool share; per-hall savings reports through the dashboard; a nomination right — participants may put forward one hall per year for priority scheduling.
Milestones: Crew hired, first 3 halls under contract · 12 halls completed, average energy reduction verified at 30%+ · program funding renewed for the next group of halls · 30 halls completed, waitlist opened to Saskatchewan towns
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Small-Town Water Meter Modernization — AMI Conversion T3 Growth
Hundreds of small Alberta towns still read water meters by walking house to house, estimate a third of their bills, and lose treated water they can't account for.
| Project value | $600,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Partner town agreement signed, meters ordered |
| Participation gate | Hold ≈ — AEDI ($6,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the installation contract (financed over the agreement term) plus a monthly per-connection reading-service fee. The town's non-revenue-water percentage is reported quarterly from ERP data; the project's service fee is partly indexed to measured loss reduction.
What involvement gets you: the pool share; quarterly water-loss and service reporting; priority participation when the next town's conversion opens in this ERP.
Milestones: Partner town agreement signed, meters ordered · installation complete, first fully automated billing cycle · non-revenue water down 5 points from baseline · second town signed on the first town's published results
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Regional Recycling Processing Upgrade T3 Growth
A regional waste commission's materials facility still hand-sorts lines that modern optical sorters handle at triple speed — and contaminated bales get rejected by buyers.
| Project value | $900,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Commission agreement and equipment order |
| Participation gate | Hold ≈ — AEDI ($9,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: a per-tonne processing agreement with the commission, plus the project's share of the improved material-sales margin that better bale quality produces. Tonnage, contamination rates, and buyer settlements are ERP records.
What involvement gets you: the pool share; tonnage and bale-quality reporting through the dashboard; an annual facility tour with the operations lead.
Milestones: Commission agreement and equipment order · line installed and commissioned · contamination rate halved, first premium-grade bale settlements · throughput at design capacity for a full quarter
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Municipal Fleet & Works-Yard Electrification T4 Established
A mid-size Alberta city's works yard runs dozens of light-duty vehicles on fuel bought at retail and maintenance done at dealer rates.
| Project value | $3,200,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Service agreement executed, charging yard built |
| Participation gate | Hold ≈ — AEDI ($32,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the per-vehicle monthly service rate over the agreement term, including charging infrastructure and scheduled maintenance. The diesel-baseline comparison is published quarterly.
What involvement gets you: the pool share; fleet performance reporting (cost per km vs diesel baseline, uptime); priority participation in the second city's conversion when it opens.
Milestones: Service agreement executed, charging yard built · first 20 vehicles in service · full light fleet converted, first annual savings audit · second municipality in negotiation on the published audit
Status: Slate — awaiting owner launch approval. Joining opens at launch.
County Stormwater & Flood Mitigation Program T5 Large
Spring melt and summer cloudbursts flood the same county roads, farmyards, and small-town streets every few years, and the fix is a system — storm ponds, culvert upsizing, ditch regrading, and flood barriers — not one culvert at a time.
| Project value | $18,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Program agreement executed, priority sites designed |
| Participation gate | Hold ≈ — AEDI ($180,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the county's program agreement: per-season construction delivery and program-management fees across the five seasons, plus standing inspection and maintenance agreements for the completed works. Seasonal progress, the asset register, and post-flood performance are reported from ERP data, so the county can show residents exactly what each season bought.
What involvement gets you: the pool share; per-season delivery and flood-season results reporting through the dashboard; a briefing with the program engineers before each construction season.
Milestones: Program agreement executed, priority sites designed · first season's works complete — ponds dug, priority culverts upsized · half the priority sites protected, first post-works flood season reported from the record · all five seasons delivered, inspection regime standing on the ERP asset register
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Regional Water Treatment Plant Expansion T6 Mega
A regional water treatment plant serving several towns has reached the capacity its original design allowed — new housing, industry, and the towns themselves are waiting on water the plant cannot treat.
| Project value | $85,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Commission agreement executed, expansion design complete |
| Participation gate | Hold ≈ — AEDI ($850,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: the expansion delivery agreement with the commission (staged payments against certified construction progress), plus a long-term operations-support agreement for the expanded plant. Certified progress is the payment basis — the ERP record of what was built and tested is what each stage payment stands on.
What involvement gets you: the pool share; construction and commissioning reporting through the dashboard; the annual operations review briefing with the plant's operating team.
Milestones: Commission agreement executed, expansion design complete · second treatment train under construction · new train commissioned, expanded capacity certified · full plant at expanded capacity for a full operating year, operations record standing in the ERP
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Modular Civic Buildings for Northern & Remote Municipalities T7 Giga
Fire halls, municipal offices, health clinics, and multi-use buildings in northern and remote communities cost several times the southern price and take years to stick-build inside short construction seasons — so communities wait, and some buildings never come.
| Project value | $400,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Standard designs engineered and certified, first community building delivered |
| Participation gate | Hold ≈ — AEDI ($4,000,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-building program contracts with municipalities and territorial/federal community-infrastructure programs, plus long-term maintenance agreements for the delivered buildings. A standard design built repeatedly is how the per-building cost falls program over program; the cost record per building is kept in the ERP to prove it.
What involvement gets you: the pool share across the program; per-community build reporting (designs, shipments, assemblies, handovers) through the dashboard; program briefings before each shipping season with the standing cost-per-building record in hand.
Milestones: Standard designs engineered and certified, first community building delivered · factory line at program capacity, local assembly crews trained in five communities · fifteen buildings standing across the program · northern delivery circuit at full program run-rate, maintenance agreements covering the standing fleet of buildings
Status: Slate — awaiting owner launch approval. Joining opens at launch.